Sunday, August 17, 2008
Bathroom Remodel - Day 11
Dad flew into town to help with the remodel and we were able to get lots done over the weekend. We replaced all the plumbing for the shower fixtures, replaced and wired the new exhaust fan/light, put up all all remaining backerboard and drywall, and started the mudding.
Dad with the plumbing we just ripped out of the wall.
This was in the wall 5 minutes ago.
Voila! The plumbing is back in!
Pic of the fan being installed. Notice the custom framing we had to build.
Another picture of the fan shroud being installed.
And the gaping hole in the ceiling next to the fan has been filled with sheetrock and given the first coat of mud.



And all the walls are enclosed and have one or two coats of mud, the light is installed, and there are new light switches and outlet.