Today I put another coat of mud on the drywall - another coat or two and it will be ready for priming. After I finished mudding I sketched out the location of the tiles, put up the batten board (to lay the 1st row of tiles), picked the tiles for the tub surround and then put sealer on the tiles.
Picking the tiles took a long time - every box has several different colors and it took me over an hour of pulling tiles, laying htem down, and re-arranging them on the floor until I found a pattern that I hope Meg will think looks good. Pics below...
No comments:
Post a Comment