Monday, August 18, 2008

Bathroom Remodel-Day 12

Last night I put the new shower hardware on the concrete wall - Meg, I hope you like it? It should match the new lights much better. The sink will also match this color and style.

Today I put another coat of mud on the drywall - another coat or two and it will be ready for priming. After I finished mudding I sketched out the location of the tiles, put up the batten board (to lay the 1st row of tiles), picked the tiles for the tub surround and then put sealer on the tiles.

Picking the tiles took a long time - every box has several different colors and it took me over an hour of pulling tiles, laying htem down, and re-arranging them on the floor until I found a pattern that I hope Meg will think looks good. Pics below...

New shower fixtures...

Batten board installed and 3 sample tiles (not sealed yet) up...

Arranged tiles before being sealed.

Arranged tiles after being sealed.